Book a Consultation
Call Now
ADU construction Los Angeles by Arterra Design and Build
Design. Permit. Build.

ADU Construction
& Design in Los Angeles

★★★★★ 5.0 · 150+ Five-Star Reviews

Design, permits, and construction - handled by one team, start to finish.

★★★★★ 5.0 150+ Five-Star Reviews Read Reviews →
Cost & Value

How Much Value Can an ADU Add?

For most Los Angeles homeowners, the decision comes down to monthly income, added property value, and whether the project is managed by a team they can trust.

$2,800–$5,500 Monthly Rental Income

In many LA neighborhoods, a permitted ADU can become a long-term income-producing asset.

40–80% Increase in Home Value

A permitted ADU in greater Los Angeles typically adds 40–80% to a home's appraised value — often $200,000–$550,000+ depending on size and neighborhood.

Every property is different. During your consultation, we'll provide realistic numbers based on your lot, zoning, and goals.

Why Arterra

Why Homeowners Choose Arterra

Building an ADU is a major investment. The right team should make the process clear, managed, and predictable from the first walkthrough to final inspection.

One Team From Start To Finish

Design, permits, construction, and final details are managed under one process.

Direct Builder Communication

You work with a team that knows the property, the timeline, and the decisions that matter.

Transparent Proposals

Clear scopes, itemized estimates, and realistic expectations before construction begins.

Licensed & Insured

CSLB licensed, fully insured, and built for homeowners who want the job done right.

Transparent Pricing

What does an ADU cost to build in Los Angeles?

Every property is different. Costs depend on size, type, finishes, and site conditions. After a free consultation, you'll receive a detailed, itemized proposal - no vague estimates, no surprises.

Request My ADU Budget Review
I

Garage Conversion or JADU

Most affordable, fastest path to a permitted unit and rental income. Typical timeline: 3–5 months.

II

Standard Detached or Attached ADU

400–800 sq ft, solid finishes, strong ROI. The most common ADU we build.

III

Premium ADU

800–1,200+ sq ft, custom design, high-end finishes. Built to the same standard as the main house.

Tom Cohen, Founder of Arterra Design and Build
Meet the Builder

Meet the Builder Behind Every Project

"Every project starts with me. I walk the property, review the constraints, and make sure the plan works before construction begins."
Tom Cohen
Founder & General Contractor · Arterra Design & Build
10+Years in LA
300+Projects Completed
#1114133CSLB Licensed
$2MFully Insured
Book a Consultation with Tom
How We Work

How long does it take to build an ADU in Los Angeles?

Garage conversion: 3–5 months. Detached ADU: 8–12 months. One team, clear timeline, no handoffs.

01
Consultation

Tom walks your property in person - setbacks, lot coverage, utility access. You leave with a clear picture of what's buildable and what it costs.

02
Design & Planning

Our architect produces plans, elevations, and material selections - built to pass LADBS plan check the first time.

03
Permits & Construction

We submit to LADBS, track every correction, and manage construction end-to-end - foundation through finishes.

04
Handoff & Warranty

Certificate of Occupancy, full walkthrough with Tom, and a 1-year workmanship warranty on every Arterra ADU.

ADU foundation excavation and forming — Arterra Design and Build Los Angeles Foundation & Framing
ADU under construction mid-build — Arterra Design and Build Los Angeles Mid-Construction
Completed ADU exterior Brentwood Los Angeles — Arterra Design and Build Completed
What Happens Next

After You Contact Us

The goal of the first conversation is not to pressure you. It is to understand your property, clarify what may be possible, and give you a realistic next step.

Schedule a Property Walkthrough

We review the lot, access, existing structures, and the type of ADU that may fit.

Review Your ADU Options

Detached ADU, garage conversion, attached ADU, or JADU — based on your goals and property.

Receive a Preliminary Budget Range

You get a realistic direction before committing to design, permits, or construction.

Get a Clear Plan

If the project makes sense, we map the next steps for design, permits, timeline, and build.

Areas We Serve

ADU Construction Across Los Angeles

Arterra works with homeowners across the Westside, Valley, and surrounding Los Angeles neighborhoods.

BrentwoodSanta MonicaPacific PalisadesCulver CityMar VistaWest HollywoodSherman OaksStudio CityEncinoBeverly Hills
Common Questions

What every Los Angeles homeowner asks before building an ADU

Total timeline from signed contract to Certificate of Occupancy: 8–12 months is typical. Roughly half is design and permits; the other half is active construction. Garage conversions can be done in 3–5 months. Detached ground-up ADUs run 8–12 months. The permit phase is the least predictable part - which is why working with a contractor who knows LADBS's ADU process makes a real difference.

It depends heavily on type, size, finish level, and your specific lot. We give you a real, written estimate after an in-home consultation - free, about an hour, no obligation.

Almost certainly yes. California state law allows ADUs on virtually any single-family residential lot, and HOAs cannot prohibit them. Setbacks, lot coverage, and height limits still apply - but the question we answer at the consultation isn't whether you can build, it's exactly what you can build and which type makes the most sense for your property.

As of 2026, owner-occupancy is no longer required by California state law for ADUs built before 2025. Check with your specific jurisdiction for any remaining local rules - we can help clarify this for your city.

In premium areas - Beverly Hills, Santa Monica, Brentwood - a 1-bedroom detached ADU typically rents for $3,500–$5,500/month. In mid-tier areas like Culver City, Mar Vista, and Sherman Oaks: $2,800–$4,500. Studios and JADUs run $1,800–$3,200. These aren't projections - they're what we see our clients collecting.

Yes - but only on the value added by the ADU, not your entire property. California's Prop 13 protections still apply to your primary structure. The increase is typically modest relative to the rental income the ADU generates.

Financing options are available. Arterra Design & Build offers lender-friendly pathways and partnered financing programs to help support project affordability. All financing is subject to lender approval and may require separate documentation.

Yes - permitted ADU construction requires plans drawn by a licensed architect and stamped by a structural engineer. We handle this in-house. You don't hire an architect separately and hope they know LADBS. One team, one timeline, one point of contact throughout.

Free Consultation

Your property holds more potential than you think.

One hour with Tom. We walk the lot, talk through what's possible, and give you a real number - no obligation, no pitch.

(818) 371-1202

We respond within 2 business hours · Sunday through Friday